When a new transformer is months away, a tested used or surplus unit can be on site in weeks. We source used pad mount, dry type and substation transformers across North America, insist on the test reports before anything ships, and quote them delivered.
Surplus, used and reconditioned
Surplus new units come from cancelled projects and overbuilt orders and are effectively new. Used units were pulled from working service, usually during an upgrade, and are sold with whatever condition and paperwork they have. Reconditioned or remanufactured units have been opened up, repaired or rewound where needed, refilled, repainted and retested, and carry the highest price of the three.
Price follows that order. So does risk, the other way round. A surplus unit with the factory test report is the safest buy on the used market, and a used unit with no test history is the riskiest.
Types of used transformer we source
Each line has its own page with ratings, sizes and what to ask for.
| Type | Typical range | Where to look next |
|---|---|---|
| Three phase pad mounted, oil filled | 45 to 2,500 kVA on our rating pages, larger on request | Used pad mounted transformers |
| Single phase pad mounted | 25 to 167 kVA, 120/240 V secondary | Single phase pad mounted transformers |
| Dry type, ventilated and cast resin | Indoor units for buildings and plants | Dry type transformers |
| Substation and power transformers | MVA rated units for substations | Substation transformers and substations |
Why buyers are looking at used
Wood Mackenzie expected a 30 percent supply deficit for power transformers and 10 percent for distribution transformers in the US in 2025. Since 2019, demand for power transformers has risen 119 percent and for distribution transformers 41 percent. Imports were expected to supply about 80 percent of US power transformers and half of distribution transformers in 2025, and the firm warned that new tariffs, including 50 percent on copper, would push costs higher.
The made to order quotes we see for new pad mounts run 17 to 26 weeks after release, plus four to five weeks of approval drawings before that. A used or surplus unit that is already built skips the queue. The wait becomes testing, any repair and the freight.
Test reports to demand before you pay
Every one of these tests is quick and cheap next to the price of a transformer that fails on energising. Ask for each in writing, on the unit's serial number, with the date.
| Test | What it shows | What good looks like |
|---|---|---|
| Turns ratio (TTR), on every tap | Shorted turns, open windings, a wrong tap or a winding that has moved | Within 0.5 percent of the calculated ratio, the IEEE tolerance used by NETA field testers |
| Winding resistance | Loose internal connections, tap changer faults, broken strands or crimps | Phases match each other and the factory report |
| Insulation resistance and polarization index | Insulation weakened by heat, age or moisture | No fall against an earlier reading on the same unit |
| Power factor on windings and bushings | Dielectric losses in the insulation | A low, stable value. A rising trend points to deterioration |
| Dissolved gas analysis of the oil | Overheating or arcing inside the tank | No pattern of active arcing or overheating |
| PCB test of the oil, by a lab | Whether the unit is regulated as a PCB transformer | Under 50 ppm, with a lab reporting limit below 50 ppm |
PCBs, the test that decides whether a unit can move
In the US a lab result puts an oil filled transformer into one of three groups. Under 50 ppm is non PCB. From 50 to 499 ppm it is PCB contaminated and needs controlled handling. At 500 ppm and up it is a PCB transformer under the full TSCA rules, and the owner inherits the disposal liability.
A field screening kit is fine for a first look, but any result near 50 ppm needs a lab, using a method such as EPA 8082A or ASTM D4059. A non detect only means under 50 ppm if the lab's reporting limit is below 50 ppm. Electrical Trader puts the cost of PCB testing at about $500 to $5,000 for many distribution units and $5,000 to $30,000 for large power transformers. Any oil filled unit without a clear PCB record should be tested, and we do not quote a used oil filled unit without a written result.
Nameplate data to send
If you are matching an existing unit, a clear photograph of the old nameplate answers most questions at once. Otherwise send the kVA, the primary voltage and connection, for example 12470GrdY/7200, the secondary voltage, for example 480Y/277, the impedance, the taps, the cooling class and the fluid. The nameplate guide explains every field.
As is, tested or warrantied
As is means you get what is there and the test risk is yours. Tested means the seller has run and reported the tests above and you can judge the unit. Reconditioned units often come with a seller warranty, so ask how long it runs, what it covers and who pays freight on a return. A warranty on a 2,500 kVA unit that makes you ship it back at your cost is worth less than it sounds.
Shipping and setting an oil filled unit
Ask for the shipping weight and the footprint with the quote and check them against the pad, the crane reach and the site access before the unit leaves the yard. The pad mounted ratings pages list typical dimensions and weights for every standard size, and the installation guide covers the pad and clearances.
What to send for a quote
- kVA, primary voltage and secondary voltage, for example 1,500 kVA, 12470GrdY/7200 to 480Y/277
- Type, pad mount, dry type, pole or substation
- Single or three phase, and the impedance if you are matching an existing unit
- Surplus new, used or reconditioned, and the tests you need on paper
- A nameplate photo if you are replacing a unit
- Site ZIP code and the date you need it energised
Common questions
Is it safe to buy a used transformer
It is when the unit has passed a turns ratio test, winding resistance, insulation resistance, power factor and dissolved gas analysis, and has a lab PCB result under 50 ppm in writing. Without those reports you are buying a guess.
How fast can I get a used transformer
A used or surplus unit that is already built usually ships once it is tested and paid for, so the wait is testing, any repair and the freight. Made to order new pad mounts are being quoted at 17 to 26 weeks after release plus four to five weeks of approval drawings.
Do used transformers need a PCB test
Any oil filled unit without a clear PCB record should be tested before it is moved, sold or scrapped. Under 50 ppm is non PCB, 50 to 499 ppm is PCB contaminated and 500 ppm and up is a PCB transformer, with different handling and disposal rules.
Do you buy used transformers
Yes. Send the nameplate photo, the location and whether the unit is still in service. Decommissioned units have resale or scrap value, and the scrap value calculator gives a first number.
Does a used transformer meet the DOE efficiency standard
The DOE 2016 efficiency standard applies to new liquid immersed distribution transformers. A used unit built before it will not meet it. That is legal for a used purchase, but check any specification, utility standard or energy code that asks for it.
Related pages
Sources
- pv magazine, US transformer supply may fall sharply in 2025, says Wood Mackenzie, August 2025
- pv magazine USA, Grid transformers face significant supply deficits, says Wood Mackenzie, August 2025
- Maddox, Guide to transformer testing standards
- Electrical Trader, PCB testing for old transformers guide
- TestGuy wiki, Transformer diagnostics and condition assessment
- Pad Mount Supply, transformer lead times as quoted to us, September 2026
Market figures are public asking prices and published industry figures, dated where the source gives a date. They are not our prices. A quote from us is a delivered price for a specific unit.