Home / Products / Dry type transformers / 75 kVA dry type transformer, 480 to 208Y/120
75 kVA dry type transformer, 480 to 208Y/120
A 75 kVA three phase dry type transformer from 480 volts to 208Y/120 draws 90.2 amps on the primary and delivers 208.2 amps on the secondary. In November 2026 public listings put a new unit at about $3,200 to $5,500 and a few branded copper models above $8,000, while used and reconditioned units list at about $1,000 to $2,000. A stock unit ships in days, a factory order takes 20 weeks or more. We quote new, new surplus and reconditioned 75 kVA units delivered.
What a 75 kVA 480 to 208Y/120 transformer carries
This is the standard building transformer. It takes the 480 volt three phase feeder and makes 208Y/120 for lighting, receptacles and small equipment panels. At full load it carries 90.2 A at 480 V and 208.2 A at 208 V.
The table shows the full load current of a 75 kVA unit at every common voltage, computed from kVA times 1000 divided by the voltage times 1.732.
| Voltage | Use | Full load amps at 75 kVA |
|---|---|---|
| 480 V | Primary of a 480 to 208Y/120 or 480 to 240 unit | 90.2 A |
| 600 V | Primary in Canada and some plants | 72.2 A |
| 240 V | Secondary of a 480 to 240 delta unit | 180.4 A |
| 208 V | Secondary of a 480 to 208Y/120 unit | 208.2 A |
Computed. Use the kVA to amps calculator for any other rating.
Public prices, November 2026
These are asking prices from distributor and surplus listings read in November 2026. They are not our prices. The spread is wide because enclosure, winding metal and stock position all change the number, and a distributor list price can be twice its sale price, as the Sola Hevi-Duty listing below shows.
| Unit | Condition | Price | Seller |
|---|---|---|---|
| Sola Hevi-Duty EE2H75S, 480 delta to 208Y/120, NEMA 3R | New | $3,192 (typical $6,917) | Standard Electric Supply |
| Eaton V48M28T7516, ventilated, DOE 2016 | New | $4,095 to $5,016 across listings | Elliott Electric |
| Acme T3075K0013BSF, NEMA 3R | New | $5,510 plus $185 delivery | Zoro |
| Square D EXN75T3HCU, copper | New | $8,662 plus $185 delivery | Zoro |
| Hevi-Duty T2H75, NEMA 1, one year warranty | Reconditioned | $2,000 | EMSCO |
| Cutler-Hammer N43M28T75A | Used | $1,782 | Surplus Record listing |
| Square D 75T3H | Used | $1,695 | Surplus Record listing |
| General Electric 9T23A3874 | Used | $1,000 | Surplus Record listing |
Asking prices from the sources listed below. Freight, taxes and installation are extra.
Lead times
Stock is the fast route. Maddox says its in stock dry type units ship in 3 to 5 business days, and Phoenix Phase Converters gives the same 3 to 5 days on its stock isolation units. A factory order is far slower. Terrapin Construction Group lists dry type transformers up to 2 MVA, 480 to 208 V, at 20 to 32 weeks in 2026. ELSCO says a complex build to order dry type can take 50 weeks to well over a year, and offers its own modified stock units in 10 to 12 weeks.
For a 75 kVA unit at a standard voltage, ask for stock first. A special voltage, copper windings or a low temperature rise is what pushes an order onto the factory schedule.
Sizes, weights and specs
In the listings below a 75 kVA dry type is a floor mounted box 34 to 43 inches tall and 28 to 30.5 inches wide, weighing 505 to 570 lb. These are the published figures.
| Unit | Size | Weight | Notes |
|---|---|---|---|
| Eaton V48M28T75 | n/a | 505 lb | 150 C rise, 2 taps at +2.5% and 4 at -2.5% |
| Eaton V48M28T7516 | 43 in H x 30.5 in W x 24 in D | n/a | DOE 2016 efficiency |
| Sola Hevi-Duty EE2H75S | 34 in H x 28 in W x 26 in D | n/a | NEMA 3R, 150 C rise, 220 C insulation, UL and cUL listed |
| Hevi-Duty T2H75 | 34 in H x 28 in W x 19 in D | 570 lb | NEMA 1 indoor, reconditioned |
From the maker and seller pages listed below. Check the submittal drawing before you set a pad or a wall bracket.
NEMA 1 or NEMA 3R, aluminum or copper
A ventilated NEMA 1 unit is for indoor electrical rooms. Outdoors it needs a NEMA 3R enclosure or a weather shield kit, as on the Sola Hevi-Duty and Acme 3R units above. Most stock units are aluminum wound. Copper wound units such as the Square D EXN75T3HCU cost more, which is why that listing sits at the top of the price table. Our NEMA enclosure chart explains each rating.
Catalog numbers you will see
All of these are 75 kVA, three phase, 480 V primary and 208Y/120 V secondary, taken from the listings cited on this page. Send us any of them and we quote the same rating from stock, new or reconditioned.
- Eaton V48M28T75 and V48M28T7516, 480 delta to 208Y/120, ventilated
- Square D EE75T3H and 75T3H, and the copper EXN75T3HCU
- Sola Hevi-Duty EE2H75S, NEMA 3R, and the older Hevi-Duty T2H75
- Acme T3075K0013B and T3075K0013BSF
- Cutler-Hammer N43M28T75A on older surplus units
- Federal Pacific T48LH2Y-75, NEMA 3R
DOE efficiency now and from April 2029
Low voltage dry type transformers sold in the United States must meet DOE efficiency levels. For a three phase 75 kVA unit the level is 98.60 percent under the 2016 rule. For units made in or imported into the United States on or after April 23, 2029 it rises to 98.88 percent. Rex Power Magnetics notes that this looks small but is a 20 percent cut in losses for three phase units, and that units built before the date can still be sold and installed after it.
Other voltages at 75 kVA
The same frame comes in other windings. A 480 to 240 delta unit feeds older 240 V equipment at 180.4 A. A 600 to 208Y/120 unit serves Canadian and some plant systems. A 208 to 480 step up feeds a 460 V motor or machine from a 208 V service, and a 480 delta to 480Y/277 unit is an isolation transformer, covered on its own page.
What to send for a quote
- Primary and secondary voltage, for example 480 delta to 208Y/120
- Indoor NEMA 1 or outdoor NEMA 3R
- Aluminum or copper windings, and temperature rise if specified
- K factor or electrostatic shield if the load is nonlinear
- New, new surplus or reconditioned
- Quantity and the delivery ZIP code
Common questions
How much does a 75 kVA transformer cost
In November 2026 public listings put a new 75 kVA, 480 to 208Y/120 dry type at about $3,200 to $5,500 for common aluminum units and $8,662 for a Square D copper model. Used and reconditioned units listed at $1,000 to $2,000. Freight is extra.
How many amps is a 75 kVA transformer at 480 to 208
90.2 A on the 480 V primary and 208.2 A on the 208Y/120 secondary at full load, three phase.
How much does a 75 kVA dry type transformer weigh
Eaton lists its V48M28T75 at 505 lb, and a reconditioned Hevi-Duty T2H75 is listed at 570 lb. Plan for 500 to 600 lb.
How long does a 75 kVA transformer take to get
A stock unit ships in 3 to 5 business days from sellers such as Maddox. A factory order was quoted at 20 to 32 weeks in 2026 by Terrapin Construction Group for 480 to 208 V dry types.
What changes for 75 kVA transformers in 2029
Units made or imported on or after April 23, 2029 must reach 98.88 percent efficiency, up from 98.60 percent for a three phase 75 kVA unit under the 2016 rule.
Can a 75 kVA dry type transformer go outside
Yes, in a NEMA 3R enclosure or with a weather shield. A ventilated NEMA 1 unit is for indoor use only.
Related pages
Sources
- Standard Electric Supply, Sola Hevi-Duty EE2H75S
- Elliott Electric, Eaton V48M28T7516
- Zoro, Acme T3075K0013BSF 75 kVA NEMA 3R
- Zoro, Schneider Electric EXN75T3HCU
- EMSCO, Hevi-Duty 75 kVA 480 to 208Y/120 reconditioned
- Surplus Record, Cutler-Hammer N43M28T75A 75 kVA
- Surplus Record, Square D 75T3H 75 kVA
- Surplus Record, General Electric 9T23A3874 75 kVA
- Surplus Record, Federal Pacific T48LH2Y-75
- Eaton, V48M28T75 product page
- Maddox, Low voltage dry type transformers
- Terrapin Construction Group, Switchgear, transformer and generator lead times in 2026
- ELSCO, Average lead times of dry type transformers
- Rex Power Magnetics, DOE 2029 efficiency standards for dry type transformers
Market figures are public asking prices and published industry figures, dated where the source gives a date. They are not our prices. A quote from us is a delivered price for a specific unit.