A 2 MW generator set is rated 2,000 kW, which is 2,500 kVA at the usual 0.8 power factor and 3,007 amps at 480 volts. Data centers, hospitals, water plants and large factories buy backup power in this size. Below are the models in this class, what they burn, the public new and used prices and lead times, and the transfer switch and transformer that go with one. We source new, surplus and used 2 MW sets and quote them delivered.
2 MW, 2000 kW and 2500 kVA are the same set
Generator sets are sold in kW at a power factor of 0.8, so a 2,000 kW set is a 2,500 kVA set. A listing for a 2,000 kVA generator is a smaller unit, 1,600 kW. Check whether a price is for the standby or the prime rating, because the same engine carries a lower kW figure for prime power.
The current below is computed from 2,500 kVA. Use it for the main breaker, the transfer switch and the cable. At 480 V the current is more than most single switchboards carry, so 2 MW sets at low voltage usually feed paralleled cable runs or busway.
| Voltage, three phase | Full load amps at 2,500 kVA |
|---|---|
| 208 V | 6,939 |
| 240 V | 6,014 |
| 480 V | 3,007 |
| 600 V | 2,406 |
| 4,160 V | 347 |
| 12,470 V | 116 |
| 13,800 V | 105 |
Computed. Amps equal kVA times 1,000 divided by the square root of 3 times the voltage. Many 2 MW sets are built for 4,160 V and above, which cuts the current to a few hundred amps.
2 MW models from the main makers
These are the published ratings for the 60 Hz sets we found at or near 2,000 kW. Ratings change with voltage, emissions package and duty, so confirm on the spec sheet for the exact model you are quoted.
| Maker and model | Engine | Published rating |
|---|---|---|
| Caterpillar 3516C, 60 Hz | 3516C V16 diesel | 2,000 ekW standby, 1,825 ekW prime, 1,650 ekW continuous, listed as EPA emergency use only (Tier 2) |
| Cummins QSK60 series, 60 Hz | QSK60 diesel | 2,000 kW (2,500 kVA) standby, sold in 1,600 to 2,000 kW ratings, model code DQKAB for the 2,000 kW set |
| MTU 16V4000 DS2000, 60 Hz | 16V4000, 76.3 liter diesel | 2,000 kWe standby, 380 V to 13.8 kV |
| Kohler (now Rehlko) 2000 kW | Diesel | 2,000 kW standby, 1,810 kW prime |
From maker, dealer and spec sheet pages read November 2026, listed under sources. Some dealer pages quote kVA and some quote ekW, so compare kW with kW.
Fuel burn of a 2 MW diesel set
A 2 MW diesel set burns roughly 130 to 160 gallons an hour at full load, depending on the model and rating. A sub base tank that runs a set for 24 hours at full load has to hold more than 3,000 gallons.
| Model | 100 percent load | 75 percent load | 50 percent load |
|---|---|---|---|
| Kohler 2000 kW, standby rating | 139.6 gal/hr | 120.4 gal/hr | 82.3 gal/hr |
| Kohler 2000 kW, prime rating (1,810 kW) | 130.6 gal/hr | 108.1 gal/hr | 75.8 gal/hr |
| Kohler REOZMD 2000 kW, standby | 160.1 gal/hr | 116.8 gal/hr | 79.0 gal/hr |
From the spec sheets listed under sources. Hours of runtime equal usable tank gallons divided by the burn rate at your load.
Standby or prime, and emissions tier
Under ISO 8528, standby is for backup during an outage with a variable load and limited hours, prime is for running as the main source with no yearly hour limit, and continuous is for a constant load around the clock. The Cat 3516C sheet shows the spread, 2,000 ekW standby against 1,650 ekW continuous on the same engine.
In the US, a diesel set used only for emergency backup can be Tier 2 certified. A set used for prime power, peak shaving or rental has to meet Tier 4. Tell us the duty and we only quote sets that meet it.
New and used 2 MW generator prices
These are public listing figures, not our prices. Enclosure, controls, the emissions package, voltage and whether switchgear comes with the set move the price as much as the brand.
| Unit | Published figure | Source |
|---|---|---|
| New 2000 kW MTU 16V4000 DS2000, Tier 2, 480 V, standby | $666,765 asking | Surplus Record listing, read November 2026 |
| New 2025 Cummins 2000 kW | $899,500 asking | Machinery Trader Europe listing, read November 2026 |
| Used 2000 kW Cummins QSK60-G6, 2000 build | $419,880 asking | USPE Global listing, read November 2026 |
| Used 2000 Caterpillar 3516B, 2 MW | $374,325 asking | USPE Global listing, read November 2026 |
| Used 2000 kW MTU, about 32 hours | $598,000 asking | Machinery Trader Europe listing, read November 2026 |
Asking prices are not sold prices. Freight, the transfer switch, the pad, fuel and installation are extra. Low hour used sets can price close to new.
Lead times
Terrapin Construction Group lists diesel sets of 1,500 to 2,000 kW at 50 to 66 weeks in 2026, and 2,500 to 3,500 kW at 62 to 82 weeks, from manufacturer slot reservations and its own project procurement data. Other sources run from about 30 weeks for a new Generac high capacity line to 72 to 104 weeks in a market analysis from Enkiai, so the spread is wide and depends on maker and configuration.
A surplus or used set that already exists can ship once it is tested and paid for, so the wait is the load bank test, any repairs and the freight. That is why many buyers price a used unit next to a new one.
The gear that goes with a 2 MW set
A 2 MW set at 480 V puts out 3,007 A, so the transfer switch, the main breaker and the cable all have to be rated above that. If the set feeds a medium voltage system, it needs a step up transformer of at least 2,500 kVA, which is a standard pad mounted size, wound 480 V on one side and 4,160 V, 12,470 V or 13,800 V on the other. Two or more sets can be paralleled on switchgear for redundancy or to grow later.
We quote the set, the transformer and the transfer or paralleling gear on one delivered quote, so the ratings line up before anything ships.
What to send for a quote
- Standby, prime or continuous rating, and kW or kVA
- Voltage, for example 480Y/277, 4,160 V or 13,800 V
- Diesel or natural gas
- Emergency only or non emergency duty, and the emissions tier you need
- Enclosure, open, weather or sound attenuated, and the runtime you want from the tank
- New, surplus or used, and the hours you will accept
- Transfer switch, paralleling gear or step up transformer needed
- Site ZIP code and the date you need power
Common questions
How much does a 2 MW generator cost
Listings read in November 2026 asked $666,765 for a new MTU 16V4000 set and $899,500 for a new 2025 Cummins. Used 2000 kW sets were listed from $374,325 to $598,000. Installation, the transfer switch, fuel and freight are extra.
How many amps is a 2 MW generator
At 0.8 power factor a 2,000 kW set is 2,500 kVA, which is 3,007 A at 480 V, 6,939 A at 208 V and 347 A at 4,160 V.
Is a 2000 kVA generator the same as 2 MW
No. At 0.8 power factor a 2,000 kVA set is 1,600 kW. A 2 MW set is 2,500 kVA.
How much fuel does a 2 MW generator use
About 130 to 160 gallons of diesel an hour at full load. The Kohler 2000 kW sheet gives 139.6 gal/hr at full standby load and 82.3 gal/hr at half load.
How long is the lead time for a 2 MW generator
Terrapin Construction Group lists 50 to 66 weeks for 1,500 to 2,000 kW diesel sets in 2026. A used or surplus set in stock can ship once it has passed a load bank test.
What size transformer goes with a 2 MW generator
A step up transformer of at least 2,500 kVA, which is a standard size, wound for the generator voltage on one side and the site medium voltage on the other.
Related pages
Sources
- Penn Cat Energy, Cat 3516C 60 Hz 1650 to 2000 ekW spec sheet
- Cummins, QSK60 high horsepower generator sets
- PowerGen Enterprises, Cummins QSK60 2000 kW diesel generator set
- MTU 16V4000 DS2000 60 Hz data sheet
- Kohler, 2000 kW diesel generator spec sheet G5626
- Global Power Supply, Kohler 2000 kW REOZMD spec sheet
- Surplus Record, 2000 kW MTU 16V4000 DS2000 new, 4 available
- Machinery Trader Europe, 2025 Cummins 2000 kW new stationary generators
- Machinery Trader Europe, MTU 2000 kW used stationary generators
- USPE Global, used Cummins QSK60-G6 diesel generator set
- USPE Global, 2 MW used Caterpillar 3516B diesel generator set
- Terrapin Construction Group, switchgear, transformer and generator lead times in 2026
- Enkiai, diesel generator demand and lead times 2021 to 2026
- Data Center Frontier, Amazon and Generac deal puts backup power in the spotlight
- Power Engineering, How the Tier 4 rule affects generator specification
- Power Engineering, Understanding generator set ratings for maximum performance and reliability