Home / Products / Dry type transformers / 112.5 kVA dry type transformer, 480 to 208Y/120
112.5 kVA dry type transformer, 480 to 208Y/120
A 112.5 kVA three phase dry type transformer from 480 volts to 208Y/120 draws 135.3 amps on the primary and delivers 312.3 amps on the secondary. In November 2026 public listings put used units at about $2,200 to $5,300 and one new Acme unit at $15,450.70. The common stock model, the Hammond SG3A0112KB, is a NEMA 3R aluminum wound unit of about 680 lb. We quote new, new surplus and reconditioned 112.5 kVA units delivered.
Updated November 16, 2026
What a 112.5 kVA 480 to 208Y/120 transformer carries
This size feeds a floor of offices, a school wing or a large panel bank from a 480 volt service. At full load it carries 135.3 A at 480 V and 312.3 A at 208 V.
The table shows the full load current of a 112.5 kVA unit at every common voltage, computed from kVA times 1000 divided by the voltage times 1.732.
| Voltage | Use | Full load amps at 112.5 kVA |
|---|---|---|
| 480 V | Primary of a 480 to 208Y/120 or 480 to 240 unit | 135.3 A |
| 600 V | Primary in Canada and some plants | 108.3 A |
| 240 V | Secondary of a 480 to 240 delta unit | 270.6 A |
| 208 V | Secondary of a 480 to 208Y/120 unit | 312.3 A |
Computed. Use the kVA to amps calculator for any other rating.
Public prices, November 2026
These are asking prices from distributor and surplus listings read in November 2026. They are not our prices. Several distributors hide the price behind a sign in or a call, so the public numbers below are mostly used units and one new list price.
| Unit | Condition | Price | Seller |
|---|---|---|---|
| Acme ACMT3112K0013B, 480 delta to 208Y/120 | New | $15,450.70 | HESCO |
| Westinghouse 49M28T12G | Used | $2,217 | Surplus Record listing |
| Square D, 2023 listing | Used | $2,200 | Surplus Record listing |
| Square D, other surplus listing | Used | $5,295 | Surplus Record listing |
| Square D EE112T3HB, 80 C rise | New | Sign in to see price | Rexel |
| Hammond SG3A0112KB, NEMA 3R | New | Price on request on the pages read | Elliott Electric |
Asking prices from the sources listed below. Freight, taxes and installation are extra.
Lead times
Stock is the fast route. Maddox says its in stock dry type units ship in 3 to 5 business days. A factory order is far slower. Terrapin Construction Group lists dry type transformers up to 2 MVA, 480 to 208 V, at 20 to 32 weeks in 2026. ELSCO says a complex build to order dry type can take 50 weeks to well over a year, and offers its own modified stock units in 10 to 12 weeks.
Ask for stock first. A special voltage, copper windings or a low temperature rise is what pushes an order onto the factory schedule.
Sizes, weights and specs
Most listings for the Hammond Sentinel G SG3A0112KB give 27 in x 28.3 in x 36 in and about 680 lb, with one seller listing 710 lb. It is NEMA 3R with aluminum windings, 150 C rise and 220 C insulation. A reconditioned unit listed at 28 in x 26 in x 35 in and 710 lb shows how much older frames differ.
| Unit | Size | Weight | Notes |
|---|---|---|---|
| Hammond SG3A0112KB | 27 in x 28.3 in x 36 in | About 680 lb | NEMA 3R, aluminum, 150 C rise, 220 C insulation |
| Hammond SG3A0112KB, other listing | 28.25 in wide | 710 lb | Same catalog number, different seller figures |
| Hammond 112.5 kVA, reconditioned | 28 in x 26 in x 35 in | 710 lb | NEMA 3R, reconditioned |
From the maker and seller pages listed below. Check the submittal drawing before you set a pad or a wall bracket.
Catalog numbers you will see
All of these are 112.5 kVA, three phase, 480 V primary and 208Y/120 V secondary, taken from the listings cited on this page. The catalog numbers page lines up the same ratings across brands. Send us any of them and we quote the same rating from stock, new or reconditioned.
- Hammond SG3A0112KB (NEMA 3R) and SG3A0112BK, 480 delta to 208Y/120
- Square D EE112T3HB and EE112T3HCU (copper), and the older 112T3H
- Acme ACMT3112K0013B
- Federal Pacific T48LH2Y-112, NEMA 3R
- Westinghouse 49M28T12G and Siemens ITE 3F3Y112 on older surplus units
DOE efficiency now and from April 2029
Low voltage dry type transformers sold in the United States must meet DOE efficiency levels. For a three phase 112.5 kVA unit the level is 98.74 percent under the 2016 rule. For units made in or imported into the United States on or after April 23, 2029 it rises to 98.99 percent, measured at 35 percent load. Units built before the date can still be sold and installed after it.
When to go larger
At 312.3 A on the 208 V side a 112.5 kVA unit needs a main breaker of about 400 A. Above this size see the 150 and 225 kVA ratings, or a pad mounted unit if the primary is medium voltage.
What to send for a quote
- Primary and secondary voltage, for example 480 delta to 208Y/120
- Indoor NEMA 1 or outdoor NEMA 3R
- Aluminum or copper windings, and temperature rise if specified
- K factor or electrostatic shield if the load is nonlinear
- New, new surplus or reconditioned
- Quantity and the delivery ZIP code
Common questions
How many amps is a 112.5 kVA transformer at 480 to 208
135.3 A on the 480 V primary and 312.3 A on the 208Y/120 secondary at full load, three phase.
How much does a 112.5 kVA transformer cost
In November 2026 public used listings run from $2,200 to $5,295. One new Acme 112.5 kVA unit was listed at $15,450.70, and many distributors show no public price. Freight is extra.
How much does a 112.5 kVA dry type transformer weigh
The Hammond SG3A0112KB is listed at about 680 lb, with one seller giving 710 lb. Plan for 650 to 750 lb.
Can a 112.5 kVA dry type transformer go outside
Yes, in a NEMA 3R enclosure such as the Hammond SG3A0112KB, or with a weather shield. A ventilated NEMA 1 unit is for indoor use only.
What changes for 112.5 kVA transformers in 2029
Units made or imported on or after April 23, 2029 must reach 98.99 percent efficiency, up from 98.74 percent for a three phase 112.5 kVA unit under the 2016 rule.
Related pages
Sources
- Surplus Record, 112.5 kVA Westinghouse 49M28T12G
- Surplus Record, 112.5 kVA Square D 112T3H
- Surplus Record, 112.5 kVA Federal Pacific T48LH2Y-112
- HESCO, Acme ACMT3112K0013B
- Rexel, Square D EE112T3HB
- Elliott Electric, Hammond SG3A0112KB
- Mars Electric, Hammond SG3A0112KB
- Essential Parts, Hammond SG3A0112KB
- EMSCO, Hammond 112.5 kVA reconditioned
- Maddox, Updated DOE 2029 energy efficiency standards for distribution transformers
- Rex Power Magnetics, DOE 2029 dry type transformer efficiency rules
- Maddox, Low voltage dry type transformers
- Terrapin Construction Group, Switchgear, transformer and generator lead times in 2026
- ELSCO, Average lead times of dry type transformers
Market figures are public asking prices and published industry figures, dated where the source gives a date. They are not our prices. A quote from us is a delivered price for a specific unit.