75 kVA 12470 to 480Y/277 pad mounted transformer

A 75 kVA three phase pad mounted transformer with a 12470GrdY/7200 primary and a 480Y/277 secondary draws 3.5 amps on the primary and 90.2 amps on the secondary at full load. It measures about 52 x 50 x 55 inches and weighs about 1,750 lb. Updated 19 November 2026.

Updated November 21, 2026

Rating
75 kVA
Primary
12470GrdY/7200
Secondary
480Y/277
Primary amps
3.5
Secondary amps
90.2

Specifications

Primary voltage12470GrdY/7200, grounded wye, 15 kV class
Secondary voltage480Y/277, four wire
BIL95 kV listed for this primary in a published design standard
Typical impedance4.0 percent. Published ranges for this size run wider, so use the nameplate
DimensionsAbout 52 x 50 x 55 in, width by depth by height
WeightAbout 1,750 lb including fluid
FeedLoop or radial, see below

Full load and fault current

SideLine voltageFull load amps
Primary12,470 V3.5 A
Secondary480 V90.2 A
Secondary fault, infinite bus480 V2,255 A

Computed here. The fault figure is full load amps divided by 4.0 percent impedance and is a ceiling, since the utility source adds impedance.

Tap settings at a 12470 primary

Two taps above and two below nominal at 2.5 percent steps, full capacity, are standard on this site's ratings. This table shows the primary voltage each tap sets and the secondary a 12470 volt supply then delivers.

TapPrimary tap voltageSecondary at 12,470 V in
+5%13,094 V457 V
+2.5%12,782 V468 V
0%12,470 V480 V
-2.5%12,158 V492 V
-5%11,847 V505 V

Details on how taps work.

Loop or radial feed

At 12470 volts a 75 kVA unit on a residential or commercial lateral is usually fed either in a loop, with six primary bushings so the line passes through, or radial with three. Which the utility wants decides the order. See loop feed versus radial feed and dead front versus live front.

Same rating, other voltages

The secondary current changes with the voltage. For the 208Y/120 secondary, use the kVA to amps calculator. For an indoor 480 volt unit see the 75 kVA dry type transformer. The general rating page is 75 kVA pad mounted transformer. The voltage pair is covered on 12470 to 480 volt transformers, and all voltages are listed.

Lead times, from stock or from a factory, are tracked in the transformer lead time guide. For a quote on this exact configuration, send us your spec or call 786 220 2801.

Common questions

How many amps is a 75 kVA 12470 to 480Y/277 transformer

3.5 amps on the 12470 volt primary and 90.2 amps on the 480 volt secondary at full load, from kVA times 1000 divided by 1.732 times the line to line voltage.

What does 12470GrdY/7200 mean

The primary is a grounded wye connection. 12470 volts is the line to line voltage and 7200 volts is line to neutral, which is 12470 divided by 1.732.

What BIL does a 12470GrdY/7200 primary use

A university design standard for three phase pad mounted units lists 12470GrdY/7200 at 95 kV BIL. Confirm against the serving utility specification.

What is the fault current at the 480 volt terminals

About 2,255 amps on an infinite bus with 4.0 percent impedance, which is 90.2 amps divided by 4.0 percent. A real system with source impedance sees less.

Can a 12470 unit run on a 13200 system

Only through taps. Full capacity taps of plus and minus 2.5 and 5 percent reach 13,094 volts on the high tap, so a 13200 system needs a unit specified for it. Order the primary that matches the utility.

Who sizes the primary fuse

The serving utility or the manufacturer coordinates it. Specifications seen in public bids ask the manufacturer to coordinate a partial range current limiting fuse with a Bay O Net fuse. No generic sizing is given here.

Sources

  • Southern Methodist University three phase pad mounted distribution transformer design standard, 95 kV BIL for 12470GrdY/7200.
  • Columbus, Ohio three phase pad mounted transformer specification, fusing coordination wording.
  • Surplus and dealer listings for 75 kVA 12470GY/7200 to 480Y/277 units confirm the configuration is a common one.
  • Amps, taps and fault current are computed here from kVA, voltage and the impedance on this site's 75 kVA rating page.
CallGet a quote