225 kVA dry type transformer, 480 to 208Y/120

A 225 kVA three phase dry type transformer from 480 volts to 208Y/120 draws 270.6 amps on the primary and delivers 624.5 amps on the secondary. In November 2026 dealer listings for new units ran from about $10,500 to $20,000 depending on brand, efficiency level and enclosure. The Eaton V48M28T2216 is listed at 1,622 lb. We quote new, new surplus and reconditioned 225 kVA units delivered.

Updated November 18, 2026

Get a 225 kVA quoteOr call 786 220 2801.

What a 225 kVA 480 to 208Y/120 transformer carries

This size feeds a large panel board or a whole floor of a commercial building from a 480 volt service. At full load it carries 270.6 A at 480 V and 624.5 A at 208 V.

A secondary near 625 A needs a main sized by the NEC and the panel maker. The main breakers page explains frame sizes and trip settings.

VoltageUseFull load amps at 225 kVA
480 VPrimary of a 480 to 208Y/120 unit270.6 A
600 VPrimary in Canada and some plants216.5 A
240 VSecondary of a 480 to 240 delta unit541.3 A
208 VSecondary of a 480 to 208Y/120 unit624.5 A

Computed from kVA times 1000 divided by the voltage times 1.732. Use the kVA to amps calculator for any other rating.

Public prices, November 2026

These are asking prices from dealer listings read in November 2026. They are not our prices. The spread is wide because the efficiency level, enclosure and winding metal all change the number, and the same Eaton part number showed three different prices.

UnitConditionPriceSeller
Eaton V48M28T2216, DOE 2016, 150 C riseNew$10,513, $12,877 and $15,432 on three listings of the same partElliott Electric
Square D EX225T3H, 6 taps, floor mountNew$11,885Standard Electric Supply
Square D EX225T3HF, DOE 2016New$19,410Crescent Electric
Square D EX225T3HNLPNew$19,982Steiner Electric

Asking prices from the sources listed below. Freight, taxes and installation are extra. Confirm the number with the seller.

Lead times

Stock is the fast route. Maddox says its in stock dry type units ship in 3 to 5 business days. A factory order is far slower. Terrapin Construction Group lists dry type transformers up to 2 MVA, 480 to 208 V, at 20 to 32 weeks in 2026. ELSCO says a complex build to order dry type can take 50 weeks to well over a year, and offers its own modified stock units in 10 to 12 weeks.

Ask for stock first. A special voltage, copper windings or a low temperature rise is what pushes an order onto the factory schedule.

Weights and specs

The Eaton V48M28T2216 is listed at 1,622 lb and 33.5 in by 38 in by 60 in. Other 225 kVA Eaton frames differ, so check the submittal drawing before you set a pad.

UnitSizeWeightNotes
Eaton V48M28T221633.5 in x 38 in x 60 in1,622 lbDOE 2016, ventilated, 150 C rise
Eaton V48M28F22CU56 in H x 31.25 in W x 24.25 in D1,200 lbVentilated DT-3
Eaton N48M28F22An/a1,450 lbK factor, aluminum windings

From the seller pages listed below. Weights for similar Eaton units disagree, so treat these as a range.

Catalog numbers you will see

All of these are 225 kVA, three phase, 480 V delta primary and 208Y/120 V secondary, taken from the listings cited on this page. Send us any of them and we quote the same rating from stock, new or reconditioned.

  • Eaton V48M28T2216, V48M28F22CU (copper) and N48M28F22A (K factor)
  • Square D EX225T3H, EX225T3HF, EX225T3HNLP and EX225T3HBCU
  • Acme T3225K0013B

DOE efficiency change in April 2029

Low voltage dry type transformers must meet DOE efficiency tables. The tables in 10 CFR 431.196 apply to units made from January 1, 2016 until April 23, 2029, and a tighter table applies to units made on or after April 23, 2029. Rex Power Magnetics summarizes the 2029 change as a 20 percent cut in allowed losses for three phase low voltage dry types against 2016.

Ask which efficiency table a quoted unit was built to. A unit built before the date can still be sold and installed after it.

Other voltages at 225 kVA

A 480 to 240 delta unit feeds older 240 V equipment at 541.3 A. A 600 to 208Y/120 unit serves Canadian and some plant systems. For a smaller load see the 150 kVA page, and for the full list of ratings the 480 to 208 hub.

What to send for a quote

  • Primary and secondary voltage, for example 480 delta to 208Y/120
  • Indoor NEMA 1 or outdoor NEMA 3R
  • Aluminum or copper windings, and temperature rise if specified
  • K factor or electrostatic shield if the load is nonlinear
  • New, new surplus or reconditioned
  • Quantity and the delivery ZIP code
Get a 225 kVA quoteOr call 786 220 2801.

Common questions

How many amps is a 225 kVA transformer at 480 to 208

270.6 A on the 480 V primary and 624.5 A on the 208Y/120 secondary at full load, three phase.

How much does a 225 kVA transformer cost

Dealer listings read in November 2026 put new 225 kVA, 480 to 208Y/120 dry types at about $10,500 to $20,000. Freight is extra. Send us the voltages and we quote delivered.

How much does a 225 kVA dry type transformer weigh

The Eaton V48M28T2216 is listed at 1,622 lb. Other Eaton 225 kVA frames are listed at 1,200 to 1,450 lb.

What is the lead time on a 225 kVA dry type transformer

Stock units ship in days. A factory order is slower, and Terrapin Construction Group lists dry types up to 2 MVA at 20 to 32 weeks in 2026.