Pad mounted switchgear

Pad mounted switchgear is outdoor medium voltage gear on a concrete slab. It sectionalizes underground loops, protects feeders with fuses or fault interrupters and sits beside the pad mounted transformer on campuses, solar collector systems and data center yards. PTR research reported by T&D World puts pad mounted gear at 75 percent of the US underground switchgear market. We source new, surplus and reconditioned units and quote them delivered.

Updated November 17, 2026

Types of pad mounted switchgear

The three families differ by what insulates the live parts, so the choice is mostly about size, environment and maintenance.

TypeExamplePublished ratingsNotes
Air insulated, fusedS&C PMH and PME14.4 and 25 kV, 600 A switchesS&C says air insulated gear gets too large to be practical in many applications at 34.5 kV
Solid dielectricEaton ISG-SD4 to 27 kV, fault interruption up to 20 kAMaintenance free. S&C notes lower ratings and no three position switching
Gas insulatedG&W gas insulated line, S&C VistaUp to 38 kV, 900 A continuous, 40 kA asymmetrical momentary (G&W)Compact and submersible. S&C offers a CO2 mix version with 97 percent lower global warming potential than SF6

Ratings from the makers named, read November 2026. Always confirm the figures for the model you buy.

S&C PMH and PME ratings in the public bulletins

S&C describes its PMH gear for 14.4 kV and 25 kV systems, with a maximum load break rating of 600 A at 14.4 kV. The 14.4 kV class is listed at 17.0 kV maximum with 95 kV BIL, and the 25 kV class at 27 kV maximum with 125 kV BIL. S&C bulletin 665-31 lists a short circuit rating of 25,000 A RMS symmetrical, 620 MVA, for 14.4 kV PME models PME-4, PME-5, PME-6, PME-9, PME-11 and PME-12 furnished with Fault Fiter fuse mountings. Fuse type changes the rating, so read the bulletin for your configuration.

Lead times

Terrapin data from June 2026 gives 52 to 80 weeks for 15 kV switchgear generally. One reseller knowledge base quotes 16 to 24 weeks for an S&C PMH-6 and 12 to 16 weeks for a Vista, which are single source estimates, so confirm with a quote. Stock and used units skip most of the wait.

Spec checklist to send with a request

Nominal and maximum voltage, BIL, continuous amps, available fault current, number of ways and which are switches, fused taps or fault interrupters, loop feed or radial, dead front or live front, cable entry, and the standards your utility or owner requires. Ask your engineer for the utility or owner standard.

Used and reconditioned pad mounted gear

Used units are common for exact matches to an existing loop. Ask for test records, a check of fuses and interrupters and the age of any SF6 or oil. Prices and tests are on used switchgear.

What to send for a quote

  • Nominal system voltage and the maximum voltage class wanted, for example 13.2 kV or 34.5 kV
  • Main bus amps and the short circuit rating in kA
  • Number of breakers, switches or ways, and the feeder schedule
  • Indoor or outdoor, and arc resistant or not
  • New, new surplus or reconditioned, and the date you need it on site
  • A photo of the nameplate if you are matching an existing lineup
  • Delivery ZIP code

Common questions

What voltage is pad mounted switchgear

S&C offers PMH and PME gear at 14.4 and 25 kV. G&W describes gas insulated gear for systems up to 38 kV.

What is the difference between PMH and PME

Both are S&C pad mounted gear. We could not confirm a full model by model comparison from public bulletins, so send us the model number you need and we quote it.

What does solid dielectric switchgear mean

The live parts are encapsulated in a solid insulation instead of air or SF6 gas. Eaton describes its ISG-SD as maintenance free for 4 to 27 kV.

Is pad mounted switchgear the same as a pad mounted transformer

No. The transformer changes voltage. The switchgear switches and protects circuits, and often sits beside the transformer.