Mobile substation rental, 10 to 100 MVA

A mobile substation is a power transformer, switchgear and protection built on a trailer so a utility or plant can restore or add capacity in days instead of years. We help you size the unit and quote rental or purchase, delivered to your site.

Updated November 18, 2026

What a rental mobile substation is

A mobile substation puts a power transformer, high and low side switchgear, protection and control on one or more road legal trailers. It is used when a substation transformer fails, when a station is being rebuilt or cut over, when a plant or data center needs temporary capacity, or when a load shows up before the permanent equipment does.

Rental and purchase draw on the same kind of unit. Rent when the need has an end date. Buy when the need keeps coming back, or when rental availability at your voltage is thin.

Published ratings and voltages

These figures are published by rental companies, makers and industry presentations. They show the usual range, not what is on a rental yard today.

SourceWhat it says
United RentalsMobile units typically range from 10 MVA to 100 MVA, and those under 50 MVA are the most deployable configurations for rapid response.
IEEE Winnipeg PES presentationMobile substations are generally rated 60 MVA or less. Voltage and MVA combinations are limited by DOT weight and dimension limits. A second voltage level or a load tap changer adds size and weight and cuts the MVA you can fit.
Delta StarMobile transformers up to 345 kV on the high side and portable substations up to 100 MVA at 15 to 345 kV.
Sunbelt SolomonRental units that connect to grids or sites operating at up to 230 kV.
Wind Farm BOPA 40 MVA unit at 115 kV or 138 kV is a typical wind farm mobile substation, and a late transformer is often the biggest cause of substation schedule slips.
Hitachi EnergyA 40 MVA, 150/30 kV mobile substation typically needs a few days for installation and commissioning once it is on site.

Quoted from the sources listed at the bottom of the page.

Why road weight caps the rating

A trailer must travel on public roads, so DOT weight and dimension limits set how much MVA and how many voltage levels fit on it. A second secondary voltage or a load tap changer adds weight and takes MVA away. That is why most mobile units sit well under the largest power transformers, and why a 100 MVA unit is the exception and not the norm.

One surplus listing shows the scale, a 30 MVA, 69 kV primary mobile transformer on a trailer at about 85,240 pounds. Heavier configurations can pass 100,000 pounds, which means permits and route planning.

Full load amps for common mobile ratings

Use these to check cable, switchgear and the feeder at the connection point. They are computed from the MVA and the line voltage.

MVAAmps at 13.8 kVAmps at 34.5 kVAmps at 69 kVAmps at 115 kVAmps at 138 kV
10418167845042
2083733516710084
301,255502251151126
401,673669335201167
602,5101,004502301251
1004,1841,673837502418

Computed. Amps equal MVA times 1,000,000 divided by the square root of 3 times the line voltage.

What to settle before you call

Rental quotes move fast when the request is complete. The items below decide whether a unit exists at all.

  • The MVA you need on the first day and whether load will grow, and whether you need fan stages.
  • High side and low side voltages, and whether the unit must connect to more than one source voltage.
  • Whether you need load tap changing, which adds weight.
  • How the unit connects, bus, cable or bushing, and who supplies the foundation, grounding and protection coordination.
  • The rental length, mobilization date and the route from the yard to your site.

Installation time is short, delivery of the unit is the question

Hitachi Energy describes a few days to install and commission a 40 MVA mobile substation once it is on site. The longer part is finding a unit at your voltage and getting it moved. A wind farm industry article names a late transformer as often the single largest cause of substation schedule slips, which is the reason people look at mobile units early.

Rental rates

We did not find public rental rates for mobile substations and we do not publish ours. Rental pricing depends on rating, voltage, duration, mobilization, and whether the lessor installs and commissions. Ask for rate, mobilization, demobilization and any minimum term in writing.

What to send for a quote

  • MVA and cooling needed, now and at peak
  • High side and low side voltage, and any tap changer requirement
  • Rental or purchase, and the term if rental
  • Site ZIP code, access route and the date you need it energized
  • Connection method and who supplies protection and grounding

Common questions

What size is a mobile substation

United Rentals says mobile units typically range from 10 MVA to 100 MVA, with units under 50 MVA being the most deployable. An IEEE Winnipeg presentation says they are generally rated 60 MVA or less.

How fast can a mobile substation be put in service

Hitachi Energy describes a few days to install and commission a 40 MVA, 150/30 kV mobile substation after it reaches the site. Finding a unit and moving it takes longer.

Why are mobile substations limited in MVA

Road weight and dimension limits. A second voltage or a load tap changer adds weight, which reduces the MVA that fits on the trailer.

Can I buy one instead of renting

Yes. We quote new, surplus and remanufactured mobile units as well, see the mobile substations for sale page.