Home / Tools / UPS sizing calculator
UPS sizing calculator
A 200 kW critical load with 25 percent growth at 0.9 power factor and 80 percent maximum loading needs about 347 kVA of UPS, so a 400 kVA unit. Enter your load, margins and runtime to get UPS kVA, the next standard size and battery energy.
Updated November 18, 2026
UPS standard sizes here are common catalog steps, not one maker's line. Confirm the kW rating on the data sheet of the unit you buy, because many UPS are rated at unity power factor and others at 0.9.
The formulas
Design load in kW equals critical load times one plus the growth margin. UPS kVA equals design load divided by the output power factor and by the maximum loading. Battery kWh equals design load times runtime in hours, divided by efficiency, times one plus the aging margin.
UPS size chart for common loads
This chart uses 25 percent growth, 0.9 power factor, 80 percent maximum loading, a 10 minute runtime, 90 percent efficiency and a 20 percent aging margin. Those are planning assumptions.
| Critical load kW | Design kW | UPS kVA needed | Next standard size | Battery kWh for 10 minutes |
|---|---|---|---|---|
| 10 | 12.5 | 17.4 | 20 kVA | 2.8 |
| 20 | 25.0 | 34.7 | 40 kVA | 5.6 |
| 50 | 62.5 | 86.8 | 100 kVA | 13.9 |
| 100 | 125.0 | 173.6 | 200 kVA | 27.8 |
| 200 | 250.0 | 347.2 | 400 kVA | 55.6 |
| 500 | 625.0 | 868.1 | 1,000 kVA | 138.9 |
| 1,000 | 1,250.0 | 1,736.1 | 2,000 kVA | 277.8 |
Worked example for 600 kW
Take 600 kW critical load. Growth of 25 percent gives 750 kW. Dividing by 0.9 power factor and 0.8 maximum loading gives about 1,042 kVA. The next standard size in the table is 1200 kVA. With N plus 1 redundancy you would add one more module of the same size.
What sits upstream
A UPS is fed by a utility transformer or a generator, and large units charge batteries on top of carrying the load. Size those for the UPS input kVA. See UPS kVA ratings, the kVA to amps calculator for feeders, static transfer switches and generators. For the whole data center chain see data center transformers and the PUE calculator.
Specifying power for a data hall, request a quote with the kW, voltage and redundancy.
Common questions
How do I size a UPS
Add up the critical load in kW, add a growth margin, divide by the UPS power factor, and keep the UPS under a loading ceiling so it has room for inrush and surges. Then pick the next standard size up. Battery size comes from the runtime you need.
What is the difference between UPS kVA and kW
kVA is the apparent power the UPS can deliver and kW is the real power. kW equals kVA times the output power factor. A UPS rated at 100 kVA and 0.9 power factor delivers 90 kW, and one rated at unity power factor delivers 100 kW. Read the data sheet, because both ratings are common.
How big a UPS does a 200 kW load need
With 25 percent growth, a 0.9 power factor and a limit of 80 percent loading, a 200 kW load needs about 347 kVA, so the next standard size is 400 kVA. This page uses the figures you can change in the calculator, they are planning assumptions and not a rule.
How do I size the battery for a UPS
Battery energy equals load in kW times runtime in hours, divided by the efficiency of the battery and inverter, plus a margin for aging. A common planning allowance for aging is 10 to 20 percent, from the sources listed below. Always confirm the runtime against the battery maker discharge tables.
How much growth margin should I add
Sources suggest 20 percent for a three to five year horizon and 20 to 30 percent for growth, inrush and metering error. Rapidly growing sites use 40 to 50 percent. The right figure is the one your load forecast supports.
Do I need a transformer for a large UPS
Large UPS often take a three phase feed from a transformer, and many sites add an output or isolation transformer. Size the upstream transformer and generator for the UPS input kVA, which is above the output kVA because of battery charging, then check with the maker.
Sources
- Legrand Data Center, why proper UPS sizing is crucial for data center applications, and understanding UPS capacity, kVA equals kW divided by power factor.
- GSE blog on UPS sizing for server rooms and data centers, growth margin of 20 percent standard for three to five years and 40 to 50 percent for aggressive plans.
- Electrical Trader, data center UPS sizing planning steps, 20 to 30 percent for growth, inrush and metering error.
- Engineering calculators, UPS sizing calculator for data centers, worked example of 750 kW design load at 0.9 power factor and 80 percent derate giving about 1,042 kVA, and a battery runtime formula using efficiency of 85 to 95 percent for VRLA with a 10 to 20 percent aging margin. Treat the IEEE 485 attribution on that page as unconfirmed.
- All kVA and kWh numbers here are computed from your inputs, not read from a UPS data sheet. Standard size steps are common catalog sizes, not one maker.