Main power transformers for solar and storage plants, 34.5 kV to 115, 138, 230 and 345 kV
The main power transformer, or MPT, is the big unit in a solar or storage collector substation. It takes the 34.5 kV collection system and steps it up to the transmission voltage at the point of interconnection, for example 115, 138, 230 or 345 kV. It is usually the longest lead item on the project. We search new, surplus and reconditioned units and quote them delivered.
Updated November 15, 2026
What the MPT does in a collector substation
Power from the inverter block transformers runs on underground feeders to the collector substation, where the main power transformer raises it to grid voltage. Burns and McDonnell describes an 80 MW solar plant in West Virginia tied in through a single 138/34.5 kV power transformer fed by four underground feeders. Kiewit describes a 34.5/138 kV collector substation at a 734 acre solar site that uses two transformers feeding the grid through rigid bus.
A larger public study of a 450 MWac solar plant used one 300/400/500 MVA ONAN, ONAF, ODAF unit rated 345/34.5 to 34.5 kV with a YNd1d1 connection, two 250 MVA secondaries and 11.5 percent impedance on a 300 MVA base. It chose one unit over two 250 MVA units after weighing the extra bushings, foundations and no load losses against the risk of a failure.
Full load amps by MVA and high voltage class
The table is computed from MVA divided by the square root of 3 times the line to line kV. The 34.5 kV column is the collector side, where the current is large, so the switchgear and bus ratings follow it.
| MVA | At 345 kV | At 230 kV | At 138 kV | At 115 kV | At 34.5 kV |
|---|---|---|---|---|---|
| 50 MVA | 84 A | 126 A | 209 A | 251 A | 837 A |
| 100 MVA | 167 A | 251 A | 418 A | 502 A | 1,673 A |
| 150 MVA | 251 A | 377 A | 628 A | 753 A | 2,510 A |
| 200 MVA | 335 A | 502 A | 837 A | 1,004 A | 3,347 A |
| 300 MVA | 502 A | 753 A | 1,255 A | 1,506 A | 5,020 A |
Computed values rounded to the nearest amp, at the highest cooling stage rating.
Ratings and options to specify
The nameplate carries one MVA rating per cooling stage, as in the 300/400/500 MVA example. Giga lists high voltage substation transformers up to 138 kV and 100 MVA and medium voltage units up to 35 kV and 60 MVA, with made to order times as fast as 26 weeks on its medium voltage line. Treat that as the maker claim for its own build slots.
Items to settle with the utility and the design engineer are impedance, vector group, load tap changer range, whether a tertiary winding is needed, BIL, cooling class and sound limit. The 450 MWac study found no tertiary was needed because its grounded wye high side and delta secondaries already gave the zero sequence path, so confirm that against your own study and do not copy it.
Price per MVA
The published benchmark for a new large power transformer is $15,000 to $21,000 per MVA, from the US International Trade Commission through the National Laboratory of the Rockies, as compiled by NextMSC. That gives about $1.5M to $2.1M at 100 MVA and $3M to $4.2M at 200 MVA for a plain unit. Electrical Trader lists power transformers alone at $250,000 to over $7M by size and voltage. The full substation costs more, and our collector substation page covers the package.
Lead times
Wood Mackenzie put the average power transformer at about 128 weeks in the second quarter of 2025, and large substation and generator step up units at 80 to 210 weeks. The 450 MWac study carried a 62 week lead time for its unit and froze the specification in month 4 of the design, and it kept a spare to cut an expected replacement from 14 months to about 16 weeks. If your date is fixed, ask about new unused surplus units, which ship faster than a new build, and about a rental or mobile unit to bridge the wait.
What to send for a quote
- MVA at each cooling stage, for example 60/80/100 MVA
- High voltage and low voltage, with tap range
- Impedance, vector group and BIL
- Load tap changer and tertiary winding needs
- Cooling class, fluid and sound limit
- The utility interconnection requirements
- New, surplus or reconditioned, energization date and delivery location
Common questions
What is a main power transformer
It is the transformer in a collector substation that steps the 34.5 kV collection system up to the transmission voltage of the grid connection.
What size main power transformer does a solar plant need
It follows the plant AC output and power factor requirement. An 80 MW plant used one 138/34.5 kV unit in a public project, and a 450 MWac plant used one 300/400/500 MVA unit.
How much does a main power transformer cost
The published benchmark is $15,000 to $21,000 per MVA for a plain large unit, so about $1.5M to $2.1M at 100 MVA. Options raise it.
How long does an MPT take
Wood Mackenzie put power transformers at about 128 weeks in the second quarter of 2025. One public study used a 62 week lead time.
Can I use a surplus unit
Often yes, if the ratings and voltages match. New unused surplus can ship much faster, and we search it with new and reconditioned stock.
Related pages
Sources
- Burns and McDonnell, Solar interconnection substation and switchyard
- Kiewit, Copperhead solar substation and interconnect
- Keentel Engineering, Utility scale solar collector study
- Giga Energy, Medium voltage substations
- NextMSC, US transformer and switchgear prices, lead times and supply constraints 2026, October 2026 update
- Electrical Trader, Substations, new and used equipment and costs
- Wood Mackenzie, Supply shortages and an inflexible market give rise to high power transformer lead times
- EEPower, Transformer supply chain woes persist as energy demand grows (Wood Mackenzie lead times)
Market figures are public asking prices and published industry figures, dated where the source gives a date. They are not our prices. A quote from us is a delivered price for a specific unit.